IT, production and development
Working securely on machines and plants
Working securely where systems are run, machines are controlled and software is built. With diagrams, examples, a final test and a certificate of participation.
What you learn
- You know what OT means and which devices in your hall belong to it.
- You understand why, at the plant, the safety of people and stable production come before everything else.
- You know the most common ways in which malware and attackers reach machines.
- You know that your behavior at the workplace is an effective protective measure.
- You only connect storage media and devices to machines that are approved for this.
- You know the safe route by which programs, recipes and files get to the plant.
- You keep private devices away from plants, even for charging.
- You know what to do if you find an unknown storage device.
Show all 20 learning goals
- You know why remote maintenance access is a popular target for attackers.
- You only grant remote access to a plant after the approval defined in the company.
- You check who is introducing themselves as a service technician before you grant access.
- You make sure that access is closed again after the work.
- You know why the production network is divided into zones and how the transitions are protected.
- You do not re-plug cables and do not connect your own network devices.
- You only use the intended wireless networks at the plant and no private hotspots.
- You handle access credentials for panels and controllers carefully and keep control cabinets closed.
- You recognize signs that something is wrong with the technology at a plant.
- You know whom to report a suspicion to and which details help.
- If you have a suspicion, you bring the plant into a safe state according to the usual rules without destroying traces.
- You know why an early report is right even if it turns out not to have been an attack.
Course content
5 chapters with 15 lessons. One step per page, on your phone too, with review questions for practice.
-
Why machines and plants are different about 20 minutes
- IT and OT: two worlds, one network
- What counts first at the plant
- How attacks reach the machine
-
USB sticks, storage media and laptops at the machine about 20 minutes
- Why the USB port is the most open door
- The safe route for files
- Laptops of colleagues and outsiders
-
Remote maintenance and service technicians about 15 minutes
- Remote maintenance: practical, but an open door
- Grant, watch and end remote access
- Service technicians on site
-
Zones, network sockets and wireless about 15 minutes
- Zones: areas with the same protection needs
- Cables, sockets and control cabinets
- Wireless, hotspots and access credentials
-
Recognizing and reporting anomalies about 10 minutes
- How to recognize something unusual
- Reporting: to whom and what
- Until help arrives
Completion and proof
- Final testPass mark 80%, no time limit. The questions are drawn from a pool again on every attempt. You can retake the test.
- Certificate of participationPDF per person with number, verification code, chapters, legal bases, learning time and test date.
- Training recordWho has finished and who is overdue, for everyone on one page, as PDF or Excel.
- Access12 months from the course start; start within 12 months of activation. For the refresher you book the course again.
Sources
The laws and standards this course is based on.
- IEC 62443-2-1:2024, Security program requirements for IACS asset owners
- IEC 62443-3-3:2013, System security requirements and security levels
- Directive (EU) 2022/2555 (NIS2), Art. 21(2)(g); in Germany section 28(2) and Annex 2, section 30(2) no. 7 BSIG
- BSI, Industrial Control System Security: Top 10 threats and countermeasures 2022 (BSI-CS 005, version 1.5)
- Directive (EU) 2022/2555 (NIS2), Art. 21(2)(g); in Germany section 30(2) no. 7 BSIG
- IEC 62443-2-4:2023, Security program requirements for IACS service providers
- BSI, Remote maintenance in industrial environments (BSI-CS 108, version 2.0 of 11 July 2018)
- IEC 62443-3-2:2020, Security risk assessment for system design (zones and conduits)
- Regulation (EU) 2023/1230 (Machinery Regulation), Annex III point 1.1.9, applies from 20 January 2027
- Directive (EU) 2022/2555 (NIS2), Art. 21(2)(b) and (g), Art. 23; in Germany section 32(1) BSIG